Nothing to close yet

This month has no receipts, costs, debt payments, or ending cash. Add your financial information first, or deliberately record a zero month.

Edit closed month

Explanation

Debt planning for small residential remodelers

Blueprint Debt Planner

Turn project payment timing into a debt payoff plan that protects a cash buffer before optional extra debt payments. Built for small residential remodeling contractors in Fayette County, Kentucky.

✓ Sample loaded
The need

Why debt planning is different for remodelers

A remodeling business can be profitable over the year and still run short on cash between projects. Materials, subcontractors, overhead, household needs, and debt payments can come due before customer deposits, progress draws, or final payments arrive.

Blueprint connects project payment timing to debt repayment. It protects a chosen protected reserve first, then identifies when surplus cash can safely be applied to debt.

PROJECT-AWAREUses deposits, progress draws, final payments, and direct project costs instead of assuming steady monthly income.
LIQUIDITY-AWAREMakes required payments first and uses only cash above the selected protected reserve for additional debt reduction.
RISK-AWARETests a late customer payment or cost overrun before the contractor commits cash to debt.
Unlike a traditional debt payoff calculator, Blueprint answers not only which debt gets paid next, but whether the contractor can safely afford to pay extra this month.
Guided sample: Bluegrass Home Renewal is a fictional Fayette County remodeler carrying a truck loan, materials-card balance, trailer loan, and supplier account. Its annual work is viable, but customer payments and project costs arrive unevenly. The expected plan uses strong project months to reduce high-interest debt while holding a $10,500 protected reserve. Its long-term illustration uses a reviewed typical month of $25,000 in customer receipts and $9,500 in direct project costs after the entered schedule ends. Its preset setback then delays one $15,000 customer deposit by two months and adds a $3,500 cost overrun, demonstrating when the contractor should pause optional extra payments. Change any entry or select Start blank.

Private by design: everything runs locally in this single HTML file. No information, keys, or requests are sent to an outside service.

01CalendarCurrent plan month ⌄

Rolling plan calendar

This plan keeps past months as history and future months as forecasts. Close a month by entering actual results; the next month then becomes the active planning period.

02DebtsDebt inventory ⌄

Debt inventory

Add business and personal obligations that compete for cash. The planner always makes required payments first, then directs safe extra cash according to the selected strategy.

Debt Use Balance APR % Required monthly payment Personally guaranteed

03ProjectsPayment milestones ⌄

Jobs and payment milestones

Update Projects whenever an expected payment amount, payment month, or direct project cost actually changes. The debt forecast recalculates automatically. Use Test a setback only for changes that have not happened yet.

Enter expected customer receipts, not project profit. Use one row for each deposit, progress draw, or final payment.

How to enter one project: create one row for every time money is expected to move. A $50,000 kitchen might use a $15,000 deposit row, two $12,500 progress rows, and a $10,000 final-payment row. Enter only the direct costs expected alongside each milestone.
04Plan assumptionsReserve & payoff order ⌄

Reserve and monthly obligations

Used only after the last entered project month for the illustrative long-term outlook.

05Test a setbackCheck project risk ⌄

What happens if a project does not go as planned?

Before sending extra cash to debt, test whether a late customer payment or unexpected project cost would put the protected reserve at risk. This does not change the expected forecast.

1. Customer pays late

2. Project costs more

Use $0 if you only want to test a late payment.

If the delay or cost change becomes real, update the payment milestone in Projects so it becomes part of the expected forecast.

06Analysis & your planDebt capacity & projection ⌄

Debt capacity and results

About, assumptions & technical readiness

Automated checks cover the competition’s pass/fail requirements and core model invariants. They run every time the page opens.

All information stays in this browser unless you deliberately save the local JSON plan file.